JSC “Caspian Pipeline Consortium – R”
About project
Project history
Objective
Creating interior appearance in accordance with the design project submitted by the client on the area of 4,400 square meters. Specific feature of the site is a lot of curves and jogged lines invented by designers while developing a solution for this interior. NAYADA partitions managed to solve this “captious” problem too.
Peculiarities of the project
The main peculiarity of the project was short time for such a volume: 1 months.
For information: manufacturing and installation of folding partition systems similar to NAYADA-SmartWall (visit www.hufcor.ru) by other companies operating in the Russian market in average takes 7 weeks.
The second important peculiarity was the fact that almost everything at this site was non-standard:
- The profile was painted in RAL 7012
- Abet Laminati plastic used to veneer partitions and doors was specially ordered from Italy. It was important to provide for ideal matching with the furniture selected by the customer.
- The height of specially manufactured doors was 2,600 mm.
Works of NAYADA
- Manufacturing and installing the partitions and the doors.
- All partitions and doors were manufactured and installed within one month!